{"id":4465,"date":"2023-10-23T13:00:32","date_gmt":"2023-10-23T10:00:32","guid":{"rendered":"https:\/\/www.sharakat.com.sa\/en\/?p=4465"},"modified":"2023-10-23T13:00:32","modified_gmt":"2023-10-23T10:00:32","slug":"al-haer-istp-istp-prices-announcement","status":"publish","type":"post","link":"https:\/\/newdev.swpc.sa\/en\/al-haer-istp-istp-prices-announcement\/","title":{"rendered":"Al-Haer ISTP Prices Announcement"},"content":{"rendered":"<p>SWPC is pleased to announce the evaluation completion of the submitted proposals by the Bidders for Al-Haer ISTP Project with treatment capacity of 200,000 m<sup>3<\/sup> per day. As a part of SWPC\u2019s objectives to enhance the utilization of Treated Sewage Effluent, the project includes TSE re-use system consisting of 32 km transmission pipeline with a capacity of 400,000 m<sup>3<\/sup>, pumping station and TSE reservoir tanks with a capacity of 200,000 m<sup>3<\/sup>. The project targets the commercial operation by the third quarter of 2026.<\/p>\n<p>As a result, SWPC announces the names of both Preferred Bidder and Reserved Bidder in addition to their Levelized Treatment Charges. Moreover, SWPC thanks the participating bidders and looks forward to their participation in the company\u2019s current and future projects.<\/p>\n<p>&nbsp;<\/p>\n<table width=\"690\">\n<tbody>\n<tr>\n<td width=\"224\">\n<p style=\"text-align: center;\">Levelized Cost (in SAR\/m3)<\/p>\n<\/td>\n<td style=\"text-align: center;\" width=\"234\">Consortium<\/td>\n<td style=\"text-align: center;\" width=\"231\">Status<\/td>\n<\/tr>\n<tr>\n<td width=\"224\">\n<p style=\"text-align: center;\"><strong>1.9407<\/strong><\/p>\n<\/td>\n<td width=\"234\">\n<p style=\"text-align: center;\">Miahona and BESIX Consortium<\/p>\n<\/td>\n<td width=\"231\">\n<p style=\"text-align: center;\">Preferred Bidder<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"224\"><strong>2.2041<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"234\">Acciona and TAWZEA Consortium<\/td>\n<td width=\"231\">\n<p style=\"text-align: center;\">Reserved Bidder<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SWPC is pleased to announce the evaluation completion of the submitted proposals by the Bidders for Al-Haer ISTP Project with treatment capacity of 200,000 m3 per day. As a part of SWPC\u2019s objectives to enhance the utilization of Treated Sewage Effluent, the project includes TSE re-use system consisting of 32 km transmission pipeline with a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4465","post","type-post","status-publish","format-standard","hentry","category-un-categorized"],"_links":{"self":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts\/4465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/comments?post=4465"}],"version-history":[{"count":0,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts\/4465\/revisions"}],"wp:attachment":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/media?parent=4465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/categories?post=4465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/tags?post=4465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}