{"id":12168,"date":"2022-12-08T04:44:46","date_gmt":"2022-12-08T01:44:46","guid":{"rendered":"https:\/\/www.sharakat.com.sa\/?p=12168"},"modified":"2024-07-06T04:46:44","modified_gmt":"2024-07-06T01:46:44","slug":"request-for-expressions-of-interest-for-jubail-4-6-independent-water-project","status":"publish","type":"post","link":"https:\/\/newdev.swpc.sa\/en\/request-for-expressions-of-interest-for-jubail-4-6-independent-water-project\/","title":{"rendered":"Request for Expressions of Interest for Jubail 4 &#038; 6 Independent Water Project"},"content":{"rendered":"<p>Saudi Water Partnership Company S.M.L.L.C (\u201cSWPC\u201d) is pleased to invite the submission of expressions of interest (\u201cEOI\u201d) in respect of the potential development of an Independent Water Project to be designed using Reverse Osmosis seawater desalination technology.<\/p>\n<p>The desalination plant will be located 18 kms south of Jubail Industrial City at the Arabian Gulf Coast, adjacent to the existing plant units (Jubail Phase 1, Jubail Phase 2, Jubail 3A &amp; 3B), in the Eastern Province of the Kingdom of Saudi Arabia (the \u201cProject\u201d). Power supply to the Project will be provided from the Saudi Electricity Company\u2019s high voltage network. The Project will be constructed with a 600,000 m3\/day potable water capacity and will include the desalination plant and all associated infrastructure and facilities.<\/p>\n<p>SWPC intends to conduct a competitive tender process to select a private sector developer (which may be a developer consortium) for the development, financing, procurement, implementation, operation and maintenance of the Project. The successful bidder, through a project company to be incorporated, would develop the Project and sell the entire capacity and output to SWPC under a 25-year concession pursuant to a Water Purchase Agreement (\u201cWPA\u201d). SWPC\u2019s obligations under the WPA will be supported by a credit support agreement from the government of the Kingdom of Saudi Arabia.<\/p>\n<p>SWPC requests the following:<\/p>\n<p>Interested parties should express their interest to participate in the tender process by no later than [9 January 2023]. Interested parties should submit their EOIs in electronic format (in PDF) to:<\/p>\n<p>\u2022 Mr. Khaled bin Zwaid AlQureshi<br \/>\nCEO<br \/>\nSaudi Water Partnership Company S.M.L.L.C,<br \/>\nFloor 19, Moon Tower, King Fahad Road,<br \/>\nRiyadh 12341, Kingdom of Saudi Arabia<br \/>\nEmail address: jubail4.iwp@swpc.sa<\/p>\n<p>\u2022 Mr. Stefan Ritsch<br \/>\nDirector, Infrastructure &amp; Real Estate<br \/>\nKPMG Professional Services, Airport Road,<br \/>\n3685 Riyadh Front Saudi Arabia<br \/>\nEmail: sa-fmbatch3iwp@kpmg.com<\/p>\n<p>The EOI should specify, at a minimum, the following information:<\/p>\n<p>\u2022 Name of the interested party;<br \/>\n\u2022 Name and contact details (postal address, telephone number, and e-mail address) of the appropriate point of contact to whom all future correspondence will be addressed; and<br \/>\n\u2022 Where the interested party is considering potential consortium partners, an indication of such intention and details of potential consortium partners (to the extent it is known).<\/p>\n<p>SWPC\u2019s professional advisors on the Project are:<\/p>\n<p>\u2022 KPMG Professional Services as Lead Advisor and Financial Advisor;<br \/>\n\u2022 Eversheds Sutherland (International) LLP as Legal Advisor; and<br \/>\n\u2022 WSP as Technical Advisor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Saudi Water Partnership Company S.M.L.L.C (\u201cSWPC\u201d) is pleased to invite the submission of expressions of interest (\u201cEOI\u201d) in respect of the potential development of an Independent Water Project to be designed using Reverse Osmosis seawater desalination technology. The desalination plant will be located 18 kms south of Jubail Industrial City at the Arabian Gulf Coast, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12168","post","type-post","status-publish","format-standard","hentry","category-un-categorized"],"_links":{"self":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts\/12168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/comments?post=12168"}],"version-history":[{"count":1,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts\/12168\/revisions"}],"predecessor-version":[{"id":12169,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/posts\/12168\/revisions\/12169"}],"wp:attachment":[{"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/media?parent=12168"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/categories?post=12168"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newdev.swpc.sa\/en\/wp-json\/wp\/v2\/tags?post=12168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}